1989 › ESTABLISHMENT
1989

Project Launch Timelines

Completed first engineering project and electronic upgrade to increase bandwidth capacity for TCI in middle Georgia. 400 mile new build for competitive build in Columbus, Ga.

1991
1992

Phoenix City, Ga

Complete build of 350 miles of coax plant (250 miles Aerial & 100 miles underground) for competitive build. This included all engineering, design and permitting for market build

1995

Hybrid Fiber Implementation

Completed 1200 mile fiber network in North Florida. This would support 500 home architecture being utilized in the industry during that time.

1997

Network Certification Launch

Completed 500 mile electronic retrofit in Chamblee, Ga. Optical node replacement with FP laser implementation. Certified to @home standards for up/downstream network HSD launch.

1999
2000
2001
2002
2003
2004
2006

Sweep & Network Certification

Complete Network Sweep and Certification (20,000+ miles) for launch of HSD in over 30 markets. This consisted of all cable replacements and retrofits to support new services.

2002

Tallahassee, Fl.

900 mile rebuild and HFC upgrade for Comcast. Included engineering, permitting, design, fiber overlay for HFC architecture, and complete electronic upgrade

2004
2005
2006
2008

Hurricane Restoration

Provide crews to assess damage to enable restoration of Comcast networks.  Provide support staff, construction crews, splicers to help complete emergency restoration on over 2000 miles throughout South Florida, Alabama, Louisiana, and Mississippi for multiple major Hurricanes.

2003-2005

Network Upgrade

3000 mile Network Rebuild/upgrade for Comcast in Cobb County, Walton County, the cities of Griffin and Douglasville. Project included full engineering and permitting for poles, ROW, and electrical. Rebuild consisted of complete strand, coax, and electronic replacement, including fiber overlay for HFC Architecture.

2006

HFC Upgrade

Rebuild and upgrade (450 miles) existing system in Ellijay, Ga. to include electronic retrofit and fiber implementation.

2007
2008

Clayton County

Upgrade existing system (700 miles) to HFC architecture. This includes Fiber overlay for nodes, coax rebuild, and electronic implementation to support bandwidth initiatives.

2007
2008
2009

BAU/Maintenance

Maintain all existing network in Metro Atlanta for Comcast, This included all new build, span replacements, Forced Relocates, node splits, Fiber Deep projects in designated territory. Territory included 0ver 5,000 miles of coverage

2009
2010

Baltimore Optic Upgrade

Mobilized to overlay fiber, coax extensions, and split existing optic locations due to capacity limits on network. This required fiber builds, Audits, CWDM integration, Sweep, Certification & plant hardening to meet customer specifications

2010

Cell Backhaul

Backhaul construction for connectivity to wireless industry

2011

Washington DC

Integration of new Wi-Fi technology in Metro Areas. This required survey viability per location. installation of Wi-Fi units and provisioning. Over 500 units were strategically placed in commercial areas.

PRESENT